Loading/Discharge of vessels

At our own terminals with a total logistics surface of 115.000 square meters we dispose of 5 berths with a water depth of up to 11,30 meters. Heavy lift and project cargo are being moved between ship, quay, rail, and truck by means of shore cranes.

Both terminals have ideal trimodal transport connections and are thus linked to the public railway network through rail sidings.